Weekly Meetings

Week 29, Nov 25 - Nov 27

4:03 pm - 6:34 pm (1:37hr/m)

Discussion:

We discussed the final project report deadline, covered all sections that needed special attention, and edited suggested chapters such as including an appendix with their references.

 

Action Plan:

  • Prepare presentation PowerPoint for the final project presentation.

  • Project final report

Week 28, Nov 11 - Nov 18

11:33 am - 12:34 pm (58m)

Discussion:

We discussed the project report and the status of the machine's functionality and performance.

 

Action Plan:

  • Worked on improving the paper report's final draft and made necessary edits to chapters and sections.

  • Continue to troubleshoot and work on design engraving precision to be more accurate.

Week 27, Nov 4 - Nov 11

11:33 am - 12:34 pm (58m)

Discussion:

We discussed the draft paper report and context that needs special attention. Also for this week meeting talked about website to be updated and issues regards memory to add images and video since our free plan website has come to a maximum upload media, solution is to use a online software to compress large video and images files.

 

Action Plan:

  • Compress videos and images to update website contexts.

  • Work on improving paper report final draft and made neccessary editing to chapter and sections.

  • Continue to troubleshoot and work on design engraving precision to be more accurate.

Week 26, Oct 31 - Nov 4

11:30 am - 1:17 pm (1:53hr/m)

Discussion:

This week's meeting we discussed the status of the CNC Machine project. The team presented system safety and adjustments made to the CNC Machine and the improvement that needs to be made to the system model. Also, discuss the draft paper report and context that needs special attention. 

 

Action Plan:

  • Include more videos of the CNC Machine in operations.

  • Work on improving system model safety such as eliminating debris and object collection. Attach vacuum module to spindle mount.

  • Establish a safety trail and test the average response for the system safety emergency shutoff.

  • Continue to troubleshoot and work on design engraving precision to be more accurate.

  • Continue working on the report and project presentation.

Week 25, Oct 24 - 31

6:00 pm - 6:45 pm (45min)

Discussion:

The team discussed the progress of the CNC Machine project and its status. Also presented and gathered feedback for the initiative project PowerPoint presentation.

 

Action Plan:

  • Add more angle videos of the entire CNC Machine in operations engraving design to the YouTube channel.

  • Work on improving system model safety such as eliminating debris and object collection.

  • Continue to troubleshoot and establish machine systems to be operational and ready to use.

  • Continue working on the report and project presentation.

Week 24, Oct 17 - 24

5:00 pm - 6:00 pm (1hr)

Discussion:

​Presented final project implementation and discussed all progress of the system model.

 

Action Plan:

  • Add more angle videos of the entire CNC Machine in operations to the YouTube channel.

  • Work on improving the website content updates.

  • Continue to troubleshoot and establish machine systems to be operational and ready to use.

  • Continue working on the report.

Week 23, Oct 10 -17

00:00 pm - 00:00 pm (0hr)

Discussion:

​This week's meeting with the professor was canceled to give the team more time to adjust and calibrate the machine. The team utilized this time effectively and completed the adjustments and calibrations on the machine. Both spindles of the machine were adjusted and are now running properly.

 

Action Plan:

  • Create a YouTube channel to show the project's progress.

  • Work on improving the website based on the noted suggestions.

  • Continue to troubleshoot and establish machine systems to be operational and ready to use.

  • Correction on Table content.

  • Provide evidence that the G-Code is open source.

  • Continue working on the report.

Week 22, Oct 3 -10

5:00 pm - 6:30 pm (1.5hr)

Discussion:

  • The team explained the progress of the project.

  • Discuss design draft report documents.  

  • Noted suggestion based on report rubric paper report.

  • Provided more details about the system model and viewed the project video on the progress log.

  

Action Plan:

  • Work on improving the paper report editing based on the noted suggestions.

  • Continue to troubleshoot and establish machine systems to be operational and ready to use.

  • Correction on Table content.

  • Continue troubleshooting and calibrating the project system.

  • Continue working on the report.

Week 21, Sept 26 - Oct 3

5:00 pm - 6:00 pm (1hr)

Discussion:

  • The team explained the progress of the project.

  • Discuss Chapter 3 design draft report documents.  

  • Discuss Chapter 3 design draft report documents.

  • Noted suggestion based on website engineering specifications and progress log.

  • Troubleshoot the machine and give more details about the system model.

  • GCode copy writes and confirms it is legality to use it.

  • The team explained the progress of the project.

  • Discuss Chapter 3 design draft report documents.

  • Table of content corrections spacing and page adjustments

  

Action Plan:

  • Work on improving the website based on the noted suggestions.

  • Continue to troubleshoot and establish machine systems to be operational and ready to use.

  • Correction on Table content.

  • Provide evidence that the G-Code is open source.

  • Continue working on the report.

Week 20, Sept 19 - Oct 3

5:00 pm - 6:00 pm (1hr)

Discussion:

  • The team explained the progress of the project.

  • Discuss Chapter 3 design draft report documents.  

  • Noted suggestion based on website engineering specifications and progress log.

  • Troubleshoot the machine and give more detail about the system model.

Action Plan:

  • Work on improving the website based on the noted suggestions.

  • Continue to troubleshoot and establish machine systems to be operational and ready to use.

  • Progress on the design paper report including editing each chapter.

Week 19, Sept 12 - 19

5:00 pm - 6:35 pm (1.35hr)

Discussion:

  • The team explained the challenges and progress of the project.

  • Embedding the Chapter report into the entire report  

  • Feedback from the Professor was received and noted based on website engineering specifications.

  • The website was reviewed, and feedback from the professor was gathered.

  • Discussion regarding the Design Report outlined in the syllabus.

  • Focus on writing and editing the final report paper, in addition to the actual machine building..

Action Plan:

  • Work on improving the website based on the feedback received.

  • Troubleshooting machine systems and making corrections.

  • Progress on the design paper report will be made throughout the week.

  • Team members were instructed to document this week's problems in the lesson part for further analysis.

 

Week 18, Sept 5 - 12

5:00 pm - 6:00 pm (1hr)

Discussion:

  • The team explained the challenges encountered in the project.

  • Feedback from the Professor on overcoming these challenges was received and noted.

  • Soft and hard deadlines were discussed, ensuring everyone was aware of the project timeline.

  • The website was reviewed, and feedback from the professor was gathered.

  • An in-depth discussion occurred regarding Chapter Three's contributions as outlined in the syllabus.

  • The decision was made to start writing the final report as work progresses.

Action Plan:

  • The team agreed to work on improving the website based on the feedback received.

  • Commencement of work on Chapter Three was assigned.

  • Testing of machine assembly at high speed was planned.

  • Progress on the report will be made throughout the week.

  • Team members were instructed to document this week's problems in the lesson part for further analysis.

 

Week 17, Aug 29 - Sept 5

5:00 pm - 6:00 pm (1hr)

Discussion:

  • Website documentation improvement

  • Engineering requirements and specification content and format

  • Success Criteria add more additional details and information

  • Table timeline and estimated due dates for project completion

Action Plan:

  • Work on editing the website and make necessary corrections

  • Review engineering requirements and specifications for the machine: justification and verification

  • Review the report and edit content for a design report paper